The essence of the exploration is to consider having 2 and not 3 pumping stations. Tarrytown’s pump station is in major need of repair and should the merger take place it would be the likely pump station to close. Briarcliff and Sleepy Hollow pump stations would then supply the water necessary for the needs of the three villages. In addition a consolidation of services would enable the reduction of personnel required to supply those services. Therefore a potential cost savings in water services and a definite cost savings in salary and compensation packages.
Captions