Photo: A significant change to occur at North State Road and Route 9A. Parkway land, which can be used by the Village, will allow for road widening and the creation of a right hand turning lane onto 9A north. There will also be a left hand turning lane onto Route 9A South and a through lane crossing over 9A towards Pleasantville Road.
No paving will be done on Pleasantville Road between South State and North State Roads. It will continue at the juncture of Pleasantville Road
Another State program entitled “Safe Routes to School” has provided a $500,000 grant that will establish a sidewalk on Ingham Road leading into the Todd School. Ingham Road, at the intersection of Pleasantville Road, will also be widened to allow for easier and safer access for school buses and other vehicles. A striped crosswalk and a pedestrian crossing signal will be installed at the Ingham and Pleasantville Roads intersection to allow the many students who live in Briarcliff’s “Tree Streets” area a safer walk to school.
Additionally, sidewalks and curbing will be replaced on Horsechestnut Road, where
The most visible and impactful roadwork will take place on both sides of North State Road at the intersection of Route 9A. On the northeast
These projects, with the exception of the bridge replacement on Pleasantville Road, are set to begin in September.